Owner: ElizabethRiver Crossings (ERC)
Cost: $1.5 Billion
Project Dates: April 2012 to Present
ThisPublic-Private Partnership project consistsofconstructinga newtunnelparallelingtheexistingMid-Towntunnel that connectsNorfolk and Portsmouth, Virginia.Workalso encompassesrehabilitating the existing tunnel,constructing the tunnel approach in Norfolk andPortsmouth,
as well as extending the MLK Expressway. The massive construction of this Toll Road is to alleviate some of the
congestion the existing tunnel experiences.
CESConsultingLLC(CES)isperforming quality assuranceinspection servicesfor thisproject.
CONSTRUCTION: Quality assurance inspection duties include:
Validatingthespecifiedqualityprocesses by establishingproduct specifications and qualityattributes
Tracking and measuring production, clearly documenting evidence
Determining operational and performance qualification
Writing and updating quality assurance procedures
Maintainingandimprovingproduct quality by completing system surveillance audits, investigatingcustomercomplaints,collaboratingwithothermembersofmanagement to develop new productand engineeringdesigns,andmanufacturingandtrainingmethods
Preparingqualitydocumentationandreportsbycollecting,analyzing andsummarizinginformationandtrendsincludingcorrectiveactions andre-validations
Immersed tube construction with pre-cast concrete tunnel segments for two-lane tunnel
Existing pile removal
New pile driving
Fireproofing of tunnel interior
Tunnel air flow installation
Existing tunnel rehabilitation
Norfolk and Portsmouth approach roadway
1.5 million cubic yards of trenching
Extension of MLK Expressway
Tunnel and roadway utilities
Toll systems installation and synchronization