This project consists of constructing two miles of truck climbing lane for slow-moving heavy vehicles. Currently, heavy trucks such as tractor-trailers often slow traffic behind them as they travel the steep grade.
CES Consulting LLC (CES) is responsible for providing the construction manager and senior scheduler for this project.
Reconfigured medians to reduce turn conflicts and side street intersection modifications
Two new roundabouts where the ramps to and from Route 7 meet Route 9 to improve traffic flow and reduce delay along Route 9
Relocated W&OD Trail through the Route 9 interchange to reduce conflicts between trail users and vehicles
A new road segment to complete the connection of neighborhoods along Beechnut Road
Extension of Fort Johnston Road to provide a connection to Alysheba Drive, Farm Market Road and Leeland Orchard Road
A new turn lane from eastbound West Market Street to the westbound Route 7 on-ramp
Detailed roadway and bridge highway cost estimating, using references such as the RS Means, historic data and other statistical methods
Independent cost estimating and analysis on change orders for FHWA compliance
Scheduling for planned work, key milestones, interaction with adjacent or district-wide work
Monitor progress by all sections of the project, R/W, utility relocation, design and construction
Contemporaneous schedule as-built
Project earnings and progress monitoring/reporting
Time/Schedule Impact Analysis for Entitlement of Time
Thorough tracking of added items and out of scope activities and the impact that has on the overall
Prepare change/work order for the project
Track project correspondences
Ensure that the correspondences are responded to with adequate supporting facts and documents
Provide necessary supporting justification documents for any change/work orders
Ensure progress photographs and daily reports are consistent
Owner: VDOT
Cost: $36.4 Million
Project Dates: June 2014 to October 2015