Route 60 Widening Project
Chesterfield, VA
Owner: Chesterfield County
Cost: $8.49Million
ProjectDates: February 2015 to May 2016
- Construction Management Contract Administration
- QA/QC
This project involves widening Rt. 60, Midlothian Turnpike, in Chesterfield, VA, from four lanes to six lanes between Alverser Drive and Old Buckingham Road. In addition to the widening, dual left turn lanes onto Alverser Drive will be constructed in the eastbound direction of Midlothian Turnpike.
CES Consulting LLC (CES) is responsible for providing the Quality Assurance Manager for this Design Build project.
![]()
THE ROUTE 60 WIDENING PROJECT FEATURES THE FOLLOWING:
- Additional eastbound and westbound lanes, widening the corridor from four lanes to six lanes
- Eastbound dual left turn lanes at Alverser Drive
- Longer turn lanes throughout the corridor
- A new traffic signal at Walmart Way
PROJECT BENEFITS:
- More convenient and safer driving experience
- Enhance access to neighborhoods, retail and businesses along Midlothian Turnpike
- More efficient commute
- Reduce the risk of accidents
QUALITY ASSURANCE/QUALITY CONTROL:
- Establish project QA/QC plan
- Determine inspection, testing and sampling frequencies for all construction materials
- Ensure that QA/QC procedures are followed
- Monitor QC activities for compliance to QA/QC plan
CHANGE MANAGEMENT:
- Thorough tracking of added items and out of scope activities and the impact that has on the overall projh4>
- Review change/work order preapared by the Design Build Contractor
DOCUMENT CONTROL:
- Track project QA/QC documents and testing logs
- Ensure that the correspondences are responded to with adequate supporting facts and documents
- Ensure progress photographs and daily reports are consistent